Tips for waste management in the construction industry

July 15, 2020
construction industry

The construction industry produces a great deal of waste, especially demolition operations. In 2017, the Australian economy generated or imported 68.9 megatonnes of waste, of which the largest contributors were:

  • Construction (20.4 megatonnes, 29.6%)
  • Households (13.8 megatonnes, 20.0%)
  • Electricity, gas, water and waste services (12.7 megatonnes, 18.4%)
  • Manufacturing (10.8 megatonnes, 15.6%)

37.5 megatonnes of waste was recovered (i.e. exported, or collected for recycling or energy recovery) by the Waste collection, treatment & disposal services industry, of which:

  • 1 megatonnes (11.1%) was exported for recycling
  • 9 megatonnes (5.1%) was recovered for energy production
  • 4 megatonnes (83.8%) was collected for domestic recycling.

Maximise waste’s potential

Another way of reducing waste is reusing and recycling materials from construction or demolition sites. Materials from construction sites that can be reused or recycled include concrete that can be broken down and used in footpaths, aluminium, steel, copper, and untreated timber. Materials that are salvaged from demolition sites include metals, plastics, cardboard, site works and vegetation, tiles and many more.

Before selling, recycling, reusing, ensure that the materials and products are still of good quality or condition – nothing should go to waste. We should all work together to reduce our carbon footprint.

Minimise waste

A part of the planning process for any construction project includes coming up with different ways to reduce and even eliminate waste, wherever possible. During the planning of the construction project, project managers should identify the exact number of resources required to avoid over-consumption. Recognizing the exact number needed avoids excess waste from unused supplies. You can minimise waste by having your construction products delivered to you with minimal packaging.

Segregate waste

Waste can be managed efficiently by introducing on-site waste storage areas.

The segregation of waste can be promoted by providing bulk bags or wheelie bins that are coloured and labelled for different types of waste. Employees can also be trained to learn about the necessary segregation procedures.

Joining with the right company

An efficient waste management system can be done with the help of experienced waste specialists. They will provide and guide you with a comprehensive plan from the demolition and debris removal of waste, General Solid Waste to transporting them to various sites that will give you and the environment the best possible results.

We are also equipped with the right tools and equipment to get the job done easily and quickly. A fleet of over 70 vehicles – we are certain that we will not let you down, we are committed to you, the customer right through to the very end.

Construction waste management aussie industries

Here at AUSSIE INDUSTRIES’ , we’ve been providing waste management solutions for over 50 years. We are forever evolving to grow and maintain best business practice.

If you want to learn more about how we can provide your waste management systems for your construction site, get in touch with us.

Our Compliance, Safety and Quality Guarantee.

Aussie Industries is certified to Australian and International Standards under three management systems which focus on compliance, safety and quality standards.

We Proudly Support

A non-profit organisation that aims to grow Aboriginal and Torres Strait Islander business sector.

Industry Partners

Keep Up To Date with Aussie

Subscribe to our newsletter and be the first to receive our latest updates, news and special offers.
Aussie Industries acknowledges the Traditional Owners of Country throughout Australia and the Darug and Eora peoples, the Traditional Custodians of the land on which we work. We pay our respect to the Elders past, present and emerging and extend that respect to all Aboriginal and Torres Strait Islander peoples.
© 2024 Aussie Industries Pty Ltd. All Rights Reserved | Website by Wolf IQ
Secure payments:

NEED AN ASBESTOS BIN?

Please call us for a quote on
1300 11 00 11

Please Note:

An excess weight charge of $275.00+GST Per Tonne will apply to Bins that exceed the specified “Max Weight” (Allowable Maximum Weight Limit)

Any bin found to contain engineered stone will be charged at $350+GST Per Tonne.

Soil / Dirt / Clay

Please read and accept before continuing.

Allowed

  • Soil, Dirt, Clay & Sand

Not allowed

  • No Other Materials Such As General Waste & Light Rubbish
  • No Concrete, Bricks, Rubble, Stones. Terracotta, Tiles
  • No Food Waste
  • No Garden Waste, Tree Trunks or Stumps
  • No liquids, batteries, chemicals, gas bottles, oil heaters or other hazardous waste
  • No Asbestos or Asbestos Containing Materials (eg. Fibro cement sheeting, corrugated asbestos roofing, insulation)

Please Note:

An excess weight charge of $275.00+GST Per Tonne will apply to Bins that exceed the specified “Max Weight” (Allowable Maximum Weight Limit)

Any bin found to contain engineered stone will be charged at $350+GST Per Tonne.

Concrete/Bricks

Please read and accept before continuing.

Allowed

  • Concrete, Bricks, Rock & Ceramic Tiles

Not allowed

  • No General Waste
  • No Food Waste
  • No Soil/Clay
  • No Garden Waste, Tree Trunks or Stumps
  • No liquids, batteries, chemicals, gas bottles, oil heaters or other hazardous waste
  • No Asbestos or Asbestos Containing Materials (eg. Fibro cement sheeting, corrugated asbestos roofing, insulation)

Please Note:

An excess weight charge of $275.00+GST Per Tonne will apply to Bins that exceed the specified “Max Weight” (Allowable Maximum Weight Limit)

Any bin found to contain engineered stone will be charged at $350+GST Per Tonne.

General Waste

Please read and accept before continuing.

Allowed

  • Light domestic waste such furniture, general rubbish and general household waste
  • E-waste, electronic goods & white goods
  • Light construction waste eg. wood, gyprock, metal
  • Office Waste
  • Cleanfill/hardfill (e.g. Soil, Dirt, Clay, Bricks & Concrete)

Not allowed

  • No food products or food waste
  • No engineered stone
  • No liquids, batteries, chemicals, gas bottles, oil heaters or other hazardous waste
  • No Asbestos or Asbestos Containing Materials (eg. Fibro cement sheeting, corrugated asbestos roofing, insulation)

Please Note:

An excess weight charge of $275.00+GST Per Tonne will apply to Bins that exceed the specified “Max Weight” (Allowable Maximum Weight Limit)

Any bin found to contain engineered stone will be charged at $350+GST Per Tonne.